PR 센터

뉴스룸

ASRB Factory

09-02-2020

BMB Steel is selected by the ASRB developer to design and build the standard lease factory located in Amata IP. Within four months, BMB Steel has already completed the first two units of this project, 5000 sq meters per unit. With the modern design and fit with typical usage, the building has been taken over by the customer for lease quickly. 

ASRB Factory

ASRB Factory 1

ASRB Factory 2

BMB Steel

최신 블로그
https://bmbsteel.com.vn/storage/2024/06/9827/dji-fly-20230928-093144-652-1695868392954-photo.jpg
1년 전
Entobel 프로젝트는 2023년 BMB Steel의 전형적인 프로젝트 중 하나로, 면적 50000 제곱미터, 강철 1000톤입니다.
https://bmbsteel.com.vn/storage/2022/01/4376/du-an-maxihub-phan-ket-cau-thep-nha-xuong-da-hoan-thanh.jpg
3년 전
BMB Steel is the main contractor for the Maxihub project - the investment owner is CPC Corporation in Taiwan. Let us learn more about this project!
https://bmbsteel.com.vn/storage/2021/10/4228/thub.gif
3년 전
The Flora Club House is a small-scale but highly complex project. BMB Steel meticulously calculates every detail of the building for optimal perfection. To learn more, let's explore this attractive pre-engineered steel building with BMB Steel in the article below!
https://bmbsteel.com.vn/storage/2021/09/3956/img-20210817-095613.gif
3년 전
Proposed Warehouse Complex is a large-scale warehouse and factory project in the Philippines market. Let's learn more about this BMB Steel!
https://bmbsteel.com.vn/storage/2021/03/2985/central-group-toan-canh-ve-du-an-tong-kho-logistic-tai-thai-lan.png
4년 전
After all challenges and difficulties in recent years, BMB Steel has excellently completed and handed over Logistic Warehouse in Thailand.
댓글 (0)
HOTLINE
(+84) 767676170
CONTACT US
NOW