PR CENTER

NEWSROOM

ASRB Factory

09-02-2020

BMB Steel is selected by the ASRB developer to design and build the standard lease factory located in Amata IP. Within four months, BMB Steel has already completed the first two units of this project, 5000 sq meters per unit. With the modern design and fit with typical usage, the building has been taken over by the customer for lease quickly. 

ASRB Factory

ASRB Factory 1

ASRB Factory 2

BMB Steel

LATEST BLOGS
https://bmbsteel.com.vn/storage/2024/06/9827/dji-fly-20230928-093144-652-1695868392954-photo.jpg
5 months ago
The Entobel project is one of BMB Steel's typical projects in 2023, with 50000 sqm and 1000 tons of steel.
https://bmbsteel.com.vn/storage/2022/01/4376/du-an-maxihub-phan-ket-cau-thep-nha-xuong-da-hoan-thanh.jpg
2 years ago
BMB Steel is the main contractor for the Maxihub project - the investment owner is CPC Corporation in Taiwan. Let us learn more about this project!
https://bmbsteel.com.vn/storage/2021/10/4228/thub.gif
3 years ago
The Flora Club House is a small-scale but highly complex project. BMB Steel meticulously calculates every detail of the building for optimal perfection. To learn more, let's explore this attractive pre-engineered steel building with BMB Steel in the article below!
https://bmbsteel.com.vn/storage/2021/09/3956/img-20210817-095613.gif
3 years ago
Proposed Warehouse Complex is a large-scale warehouse and factory project in the Philippines market. Let's learn more about this BMB Steel!
https://bmbsteel.com.vn/storage/2021/03/2985/central-group-toan-canh-ve-du-an-tong-kho-logistic-tai-thai-lan.png
3 years ago
After all challenges and difficulties in recent years, BMB Steel has excellently completed and handed over Logistic Warehouse in Thailand.
Comment (0)
HOTLINE
(+84) 767676170
CONTACT US
NOW