The MAXIHUB lube oil blending plant is a significant investment scale project. Its investment owner include Taiwan Petroleum Corporation (CPC Corporation, Taiwan) and CTCI Group (the largest EPC contractor in Taiwan). In this article, let's learn more about BMB Steel about this particular pre-engineered steel building project.

 The completed steel structure of the Maxihub project
 The completed steel structure of the Maxihub project
The project is located in Ong Keo industrial park, Nhon Trach district, Dong Nai
The project is located in Ong Keo industrial park, Nhon Trach district, Dong Nai

Overview of the Maxihub project

Insulated sandwich panels’ construction and erection of the Maxihub pre-engineered steel building project

Project’s name

MAXIHUB LUBE OIL BLENDING PLANT

Steel structure contractor

BMB Steel

Investment owner

MAXIHUB Company Limited

Project location

Ong Keo Industrial Park, Nhon Trach District, Dong Nai Province

Total area 

94,000 m2

(11,000m2)

Total quantity of steel (tons)

700

Construction time

4 months

 

MAXIHUB investment owner

Scaffolding frames are assembled to reinforce the foundation by vehicles 
Scaffolding frames are assembled to reinforce the foundation by vehicles 

MAXIHUB Company (international name: MAXIHUB Company Limited) is a company with 100% Taiwanese capital with the contribution of three investors:
1. Taiwan National Petroleum Corporation (CPC)
2. Unishine Chemical Company (UCC)
3. Excel Chemical Company (ECC)

MAXIHUB’s project overview before BMB Steel’s construction and erection of steel structure
MAXIHUB’s project overview before BMB Steel’s construction and erection of steel structure

MAXIHUB focuses on the business of importing lubricating base oils, blending and mixing lubricants, distributing small quantities into bottles, and supplying lubricants to units/partners who need to use lubricants. Besides, the company also imports and stores solvents and chemicals. The above imported materials will be tested, bottled, and distributed meticulously. 

BMB Steel’s geodetic engineer are pos the coordinates of anchor bolts
BMB Steel’s geodetic engineer are pos the coordinates of anchor bolts

Currently, after the lubricant mixing plant has been completed and put into production, MAXIHUB is in the process of building and developing the lubricant supply market in Vietnam.  

Does Taiwanese oil giant CPC step into the Vietnam market?

Supervising general contractor and BMB training new employees
Supervising general contractor and BMB training new employees

The Taiwanese government owns CPC Petroleum Corporation. It is a big player in Taiwan's economy. The Vietnamese market is predicted to have great potential for developing the lubricant industry, an opportunity for CPC to expand its business scale and grow in the international market.

BMB Steel begins construction of the chemical warehouse of the Maxihub project
BMB Steel begins construction of the chemical warehouse of the Maxihub project

CPC Chairman Tai Chein has planned to invest 1.79 billion NT$ ~  60.55 million USD to build the MAXIHUB lube oil blending plant. Once completed, the estimated capacity will supply 32 million liters of lubricants and solvents annually to CPC.

This is the second investment of this Taiwanese oil and gas tycoon in the Vietnamese market, after the success of the joint venture plant project to distribute liquefied petroleum gas in the north in 1994.
 

Maxihub lube oil blending plant

BMB conducts construction and erection of pre-engineered steel buildings
BMB conducts construction and erection of pre-engineered steel buildings

For the MAXIHUB project, BMB Steel undertakes the factory’s design and construction of the entire steel structure. The total scale of this project is 93,980 m2 (total factory area is about 11,000 m2), built-in Ong Keo Industrial Park, Nhon Trach district, Dong Nai province.

BMB steel is based on the customer's preliminary idea to offer different design options for optimizing construction costs and ensuring the highest product quality. 
Additionally, many strict standards and special rules are applied to ensure the operation of the lubricant factory as well as the strict requirements of the corporation. BMB Steel engineers had to follow the requirements and quickly correct them to keep up with the processing and construction progress.

Motor vehicles supporting the erection of roof arches
Motor vehicles supporting the erection of roof arches

The team of engineers spent almost a month and 20 days sketching and coming up with creative designs to serve the needs of the customer. There were probably 1200 times that engineers had to correct the MAXIHUB’s engineering design. In addition, quality is the key priority of BMB Steel. We also ensure high aesthetics for customers. Customers will be exceedingly satisfied when they receive great designs from BMB Steel.

Complete erection of MAXIHUB’s additive warehouse 
Complete erection of MAXIHUB’s additive warehouse 

Optimizing construction areas, minimizing costs, minimizing construction risks, being on time, and ensuring standards are the key factors that BMB Steel staff receive and meet. Besides, the construction terrain is difficult for construction, so the transportation of materials encountered many obstacles during the construction of MAXIHUB steel structure project. The road to the project is small with many pot-holes, so it is difficult to transport corrugated iron panels to the construction site. Workers transporting materials had to move slowly. All corrugated iron panels delivered to the construction site are carefully checked by BMB engineers to ensure the highest quality. In addition, because the Maxihub project is near the sea, many materials have been changed to suit the environment. For instance, BMB changed to use epoxy paint to ensure long-term product quality. In particular, the entire roof and walls of the factories are made from corrugated iron panels for heat and sound insulation.

Construction workers erect panel walls
Construction workers erect panel walls

BMB Steel was designed and built with a "speedy" progress, but the quality is still guaranteed, and the customers are extremely satisfied. After completing the Maxihub project, BMB Steel was introduced by CTCI Vietnam to become a global partner of CTCI group (CTCI Group is an EPC general contractor - EPC stands for Engineering - Procurement of goods - EPC). This is an opportunity to open a brand new way for BMB Steel to corporate with many big companies all around the world.

LATEST BLOGS
https://bmbsteel.com.vn/storage/2024/06/9827/dji-fly-20230928-093144-652-1695868392954-photo.jpg
3 months ago
The Entobel project is one of BMB Steel's typical projects in 2023, with 50000 sqm and 1000 tons of steel.
https://bmbsteel.com.vn/storage/2021/10/4228/thub.gif
2 years ago
The Flora Club House is a small-scale but highly complex project. BMB Steel meticulously calculates every detail of the building for optimal perfection. To learn more, let's explore this attractive pre-engineered steel building with BMB Steel in the article below!
https://bmbsteel.com.vn/storage/2021/09/3956/img-20210817-095613.gif
3 years ago
Proposed Warehouse Complex is a large-scale warehouse and factory project in the Philippines market. Let's learn more about this BMB Steel!
https://bmbsteel.com.vn/storage/2021/03/2985/central-group-toan-canh-ve-du-an-tong-kho-logistic-tai-thai-lan.png
3 years ago
After all challenges and difficulties in recent years, BMB Steel has excellently completed and handed over Logistic Warehouse in Thailand.
https://bmbsteel.com.vn/storage/2021/03/2978/file-1.jpg
3 years ago
During the business trip to the Southeastern provinces, on the morning of March 21, Prime Minister Nguyen Xuan Phuc attended The inaugural ceremony of Phuoc Dong Industrial Park and Port. Representative of BMB Steel signed to become a strategic partner and handed over before the deadline to IMG Phuoc Dong
Comment (0)
HOTLINE
(+84) 767676170
CONTACT US
NOW