PR CENTER

NEWSROOM

About Zhong Ju Vietnam project

07-15-2023

Bau Bang district, Binh Duong province, is becoming one of the most economically developed provinces in our country, so Bau Bang Industrial Park has recently attracted a lot of investors with remarkable development speed. Here, Tiong Liong Group (TLC) decided to stop and build the Zhong Ju Vietnam factory with pre-engineered steel buildings. In this project, BMB is honored to accompany TLC. Please follow the Zhong Ju Vietnam project through the article below!

1. Overall information about the project

The Zhong Ju project is located in the Bau Bang industrial zone, Binh Duong province. From a purely agricultural land located in the north of Binh Duong province, Bau Bang has risen strongly, becoming a locality with a developed industrial economy. Thanks to an appropriate industrial development planning strategy, Bau Bang has made outstanding marks in the process of accelerating industrialization and modernization over the years.

Zhong Ju project

Zhong Ju project

Some preliminary information about the project is below:

Project Name

TLC Factory (Zhong Ju Viet Nam)

Owner Name

Tiong Liong Corporation

Location

Bau Bang IP, Binh Duong province

Construction contractor

BMB Steel

Total land square

25,000 m2

Gross weight (tons)

1,500 tons

Time

~ 100 days

2. Tiong Liong Corporation (TLC)

As a leading performance textile supplier, Tiong Liong Corporation (TLC) has been offering performance fabrics for over 40 years by means of eco-friendly processing techniques and smart manufacturing. Thanks to the seamless integration of design, R&D, and production, our supply chain is more sustainable than ever.

As a leading performance textile supplier, Tiong Liong Corporation (TLC) has been offering performance fabrics for over 40 years by means of eco-friendly processing techniques and smart manufacturing. Thanks to the seamless integration of design, R&D, and production, our supply chain is more sustainable than ever.

We are proud to support your business through a variety of core technologies, including weaving, dyeing and finishing, functional treatment, coating, and lamination. In response to the market needs, we expand our manufacturing capacity to China and Vietnam, providing faster and more agile localized production.

More than an ordinary textile supplier, we operate our own brand while serving as a proactive partner for international specialized materials, in which we benefit customers in all parts of the world with a diverse selection of materials and streamlined services

3. Project details

After receiving the winning announcement for the Zhong Ju project, BMB engineers embarked on their work. Another journey began, and we continued to work together to design, estimate, and decide on transportation. 1,100 tons of steel entered Bau Bang Industrial Park for this Zhong Ju project.

The Zhong Ju Vietnam factory was built with a total area of 21,000 m2. This was also one of the typical projects received by BMB in the early years of the epidemic season. We understand the expectations and trust of our customers for us, so even in difficult circumstances, the BMB-ers try their best to complete the project quickly and deliver it to the partner on time, ensuring the project meets the standards of quality as well as high aesthetics.

The roof corrugated iron system used is 5-rib Seam corrugated iron, suitable for hot and humid weather all year round, rainy, windy, and stormy in Vietnam. The type of extreme weather greatly affects the quality and durability of construction work, especially in factories. Ton Seam was born to solve those fastidious requirements of users, ensure durability and still retain aesthetics, be easy to install, and reduce warranty and repair risks because of a developed system overview.

As for the paint, we apply Alkyd paint to the main structure with a primer of 40 microns and the substructure with two layers of 80 microns. Alkyd paint has high adhesion, a high shine, and good resistance to dust and stains. A painted surface can withstand external forces without peeling or fading, making it suitable for current industrial work.

The solid corrugated iron roof system of the project
The solid corrugated iron roof system of the project

4. Detailed pictures of project construction

Some typical images of the project

Some typical images of the project
Some typical images of the project

During the 100 days of construction of the Zhong Ju project, BMB always appreciated the quality of the work, which must go hand in hand with the aesthetics and completion time. Moreover, occupational safety is always the first criterion that BMB sets out for you when entering the construction site and starting work. When coming to BMB, customers will find professionalism in our expertise and the spirit of constant learning to grow. The successful completion of the Zhong Ju project is also the perfect time for BMB to once again thank TLC Group for choosing BMB as the main contractor for this project. We hope to cooperate with you on new projects in the future. How about you? How do you feel about BMB's Zhong Ju project this time? Let us know!

LATEST BLOGS
https://bmbsteel.com.vn/storage/2024/11/10487/lv-08794.jpg
1 day ago
On November 19, 2024, representatives from BMB Steel attended the Thiskyhall Sala Convention Center in Ho Chi Minh City to receive the "Top 100 Best Places to Work in Vietnam 2024" award organized by Anphabe in collaboration with Intage Vietnam.
https://bmbsteel.com.vn/storage/2024/11/10397/dsc00961.jpg
1 week ago
On November 9, 2024, BMB Steel was honored to be one of the sponsors of the Advanced Technology in Civil Engineering towards Sustainable Development - ATCESD organized by Danang University of Science and Technology.
https://bmbsteel.com.vn/storage/2024/11/10389/dsc00696.jpg
1 week ago
On November 6, 2024, the talented interns of BMB Steel had the opportunity to visit the BMB Steel and Hong Nam factories.
https://bmbsteel.com.vn/storage/2024/11/10329/dsc09836.jpg
2 weeks ago
Located in the Dong Nam Industrial Park, Cu Chi District, Ho Chi Minh City, the Tan Hoang Gia furniture manufacturing plant project is built on a total land area of 100,000 m2, with many construction items totaling up to 1,000 tons of steel.
https://bmbsteel.com.vn/storage/2024/10/10310/dsc09638.jpg
3 weeks ago
On October 25, 2024, BMB Love School Foundation and volunteers attended the scholarship award ceremony and gave gifts to children in difficult circumstances at Chu Van An Secondary School, District 1.
Comment (0)
HOTLINE
(+84) 767676170
CONTACT US
NOW