![]()
• Project: Saigon Centre phase 2&3.
• Invester: Keppel Land
• Main contructer: Bachy Soletance
Description:
BMB has completed this King Post item before 10 days of inquiries schedule. Our performance of Safety / Quality / Schedule is highly appreciated by Bachy/AECOM/SCQC/Keppel Land.

Butt joint by SAW

Built - upon support frame

Shear stud connection

Assembly Area

Bolt connection

Plunging KP

Table method of KP

Temporary cable after Segment installation