This is the first factory in Japan to produce and assembling gas pipelines in Vietnam. BMB Steel has designed, fabricated, supplied, and erected for steel structure of Sharp Mind factory, which strictly required standard “MBMA,” quality, and safety.
BMB Steel is proud to assist with the Dong Nai port-CFS project. Our works entailed the design, supply, fabrication, and erection of 160 tonnes of the steel structure.
BMB has awarded a full steel structure package and completed construction with good quality, safety, on time. The project is a testament to our reliable service and customer satisfaction.
BMB Steel has completed the fabrication and delivery of 3000 Metric Ton of DAMEN SHIPYARD within 2 months. This project is very complicated with 80 Ton crane, very high, heavy mezzanine.
NOKIA BAC NINH PROJECT - VIETNAM OPERATIONS FACTORY
As a single-source supplier, BMB Steel was pleased to assist with the design, fabrication, supply, and erection of structural steelwork total of 4,200 MT of Nokia – VietNam Operation Factory. It is located in Visp-Bac Ninh IP, Bac Ninh Province.
BMB Steel has come over all of the owner and main contractors' stringent requirements to complete the 2600 ton of king post within 75 days on time and schedule.
BMB Steel makes outstanding design - shop engineering, fabrication, and erection until now.
LEXUS SHOWROOM & SERVICES CENTRE
The Lexus showroom is built on ar 2,400 square meters, with the main 3 mezzanine floors, featuring ultimate luxury design as unique architecture, offer 5-star service to Lexus customers. It is a true milestone in the luxury car showroom industry in Viet Nam.
BMB Steel is proud to assist with Truong Hai Auto Company - Go Dau Trade Center Project. Our works entailed design, supply, fabrication, and erection of 200 tones of the steel structure.
BMB Steel is proud to be the leading premise in the steel structure engineering erection process for shipbuilding factory projects.