The most durable and cost-effective way to build a parking garage

08-05-2021

Any construction has a certain lifespan. To prolong the longevity of the work, it is crucial to choose the appropriate construction method. Having a good solution will help the garage have better longevity and save the building cost in garage construction. In this article, BMB Steel will introduce one of the most cost-effective and durable garage construction methods to you.

1. The process of building a safe garage

The process of building a safe garage

In order to build a safe, fast, and cost-effective garage, the owner should understand the construction process. It must be fully equipped with the necessary things to ensure the labor’s safety. The parking lot construction process goes through the following stages:

  • Find out reputable construction contractors
  • Prepare materials
  • Plan on drawings, investment costs
  • Manufacture components, shape the roof frame structures, etc., according to designed drawings.
  • Finish and erect
  • Check for safety and put into use

2. Standards to be ensured when building a garage

Standards to be ensured when building a garage

When constructing a garage, the following standards must be met:

  • The first is labor safety standards. It is integral to install a solid bracing, truss, steel structure and column system for workers to be safe. Besides, it will make the construction process take place smoothly.
  • Make sure the materials are good, durable, and solid
  • Design and construct must be as described in drawings
  • The quality assurance and aesthetics should not be overlooked
  • If the garage is on the ground, it should be designed so as not to be impacted by rain and sun. The parking garage requires a different drainage system, and the ground must not be flooded.

3. Effective measures in garage construction

Effective measures in garage construction

The current effective method of garage construction is to use reinforced concrete and pre-engineered steel frame systems in buildings. Often, the construction of a reinforced concrete garage will be applied with the cellar model. As for the pre fabricated building for garage, it is suitable to make an open-air garage with a roof to protect from the weather impacts. 

3.1 Reinforced concrete parking garage

Reinforced concrete parking garage

The reinforced concrete garage can be designed in weak ground terrain because it can stand firmly on many grounds. This type of garage is often applied in apartment buildings. In these buildings, the garage is usually in the basement. In addition, it is possible to build a garage with many multi-storey structures. Reinforced concrete garages are often built at a high cost because of the investment in materials and laborers.

3.2 Pre-engineered steel frame parking garage

 Pre-engineered steel frame parking garage

The pre-engineered steel frame can be used as a parking lot. Usually, it is designed in a dome shape, and the steel frame is assembled to create a solid structure. Pre-engineered steel buildings for garages can also be built with multiple floors with a concrete roof. This type of building has some advantages, such as stainless steel, low construction costs, and the fact that this structure can cover the sun and rain.

4. Which garage construction method should be chosen?

Which garage construction method should be chosen?

If you are a businessman or an owner of a garage project, you need to consider the terrain and construction site in advance. Additionally, You should identify how much investment and construction costs can be spent. At present, the trend of building garages with pre-engineered steel frames is still the best choice by virtue of these advantages:

  • Solid, durable structure
  • Low construction cost
  • Fast erection and construction time
  • Flexible assembly, multi-storey construction, convenient, suitable when building in warehouses, companies, factories.

In general, each method of parking garage construction has its own advantages in accordance with the needs of each business. BMB Steel hopes that the above information helps businesses quickly evaluate, compare and choose the most suitable solution.

최신 블로그
https://bmbsteel.com.vn/storage/2025/09/11569/xay-nha-khung-thep-tien-che-co-re-khong.png
5일 전
강철 골조 주택을 짓는 것이 더 비용 효과적인가? 건설 계획을 스마트하고 효율적으로 수립하기 위한 비용에 영향을 미치는 요소와 비용 견적을 알아보세요.
https://bmbsteel.com.vn/storage/2025/07/11471/xay-nha-kho-nho-13.png
1개월 전
비용 효율적인 소규모 공장 건설을 위한 10가지 아이디어를 찾아보세요. 프로젝트에 대한 장점, 건설 과정, 최신 가격 업데이트를 탐색해 보세요.
https://bmbsteel.com.vn/storage/2025/06/11290/nha-tien-che-cap-4-22.png
2개월 전
편리하고 비용 효율적인 주택을 찾는 사람들에게 적합한 20가지 현대적인 4단계 조립식 주택 디자인을 소개합니다. 이러한 주택이 완벽한 선택인 이유를 알아보세요.
https://bmbsteel.com.vn/storage/2025/06/11254/nha-tien-che-gac-lung-13.png
2개월 전
빠르고 아름답고 비용 효율적으로 건축하기 위한 자세한 가격 및 필수 팁과 함께 저렴하고 현대적인 메자닌 조립식 주택 디자인 10가지를 발견하십시오.
https://bmbsteel.com.vn/storage/2025/06/11234/nha-tien-che-co-ben-khong-1.jpg
2개월 전
조립식 주택은 내구성이 있습니까? 장점, 단점, 내구성 및 최고의 지속 가능한 조립식 주택 모델을 발견하세요. 확인해 보세요!
댓글 (0)
HOTLINE
(+84) 767676170
CONTACT US
NOW