Dat Hoa Binh Duong Plastic – PE Stretch Film Factory is a stunning project celebrating 27 years of establishment and development of Dat Hoa Co., Ltd., marking the success of the plastic pipe industry brand in Vietnam when gaining the trust of consumers across the country. This large-scale project is the expected cooperation opportunity of CBC, the leading Design & Construction contractor in Vietnam and Dat Hoa Plastic Co., Ltd.

1. Project overview

Project’s name

DAT HOA PLASTIC PROJECT

Investment owner

Dat Hoa Co., Ltd

Project location

Lot C-1-CN Road NA4, My Phuoc 2 Industrial Park, Ben Cat Town, Binh Duong Province

Contractor

Construction contractor: CBC

Total area

1620m2

Total volume of steel (tons)

31,132 tons

Execution time

42 days

2. Dat Hoa Co., Ltd

Dat Hoa Co., Ltd. was officially established in 1993 in Ho Chi Minh City. During 27 years of development, the company’s orientation and production scale have considerably increased. Hence, Dat Hoa has become a reputable supplier of the leading plastic pipe industry in Vietnam. With huge human resources, Dat Hoa Co., Ltd always has a team of highly specialized technicians to expand the company in three provinces, namely Ho Chi Minh City, Binh Duong and Quang Nam.

Understanding the economy's trend of Industrialization - Modernization, Dat Hoa has proved their position in the international race with a series of high-quality certified plastic products, and exported to many countries such as Australia, USA, Japan and Cambodia. Dat Hoa Group has deservedly become one of the leading companies in the field of manufacturing and trading plastic pipes serving in much civil and industrial construction such as agriculture, forestry, aquaculture in Vietnam. Along with its mission, Dat Hoa Co., Ltd. has been providing good quality products and perfect services at reasonable prices to satisfy the diverse needs of customers around the world.

Until now, the "big man" Dat Hoa is always striving to make new breakthroughs. Specifically, Dat Hoa Plastic is constantly expanding production scale, investing in modern equipment for factories with automatic technology lines to distribute throughout the Vietnam market.

3. Project details

CBC (Design & Construction contractor) has proved themselves as a high-qualified contractor when coordinating with Dat Hoa Co., Ltd. in completing the project. After the process of completion and construction supervision, the engineers considered that this is a project with a medium complexity. Specifically, within 6 weeks, the technical team had a meticulous plan to supervise the work to ensure the highest quality for each factory.

To ensure the safety for each stage of the factory construction, the design team applies careful insulation methods to be suitable with electromagnetic waves and the long wavelengths of energy. This is the key factor to serve the need of the high temperatures caused by weather. The factory must meet strict standards in terms of load, tonnage of steel and main structures to be successful when put into operation. Project details are as follows:

No.

Category

Start

Finish

1

Total progress of steel structure

25/06/2020

05/09/2020

2

Preparation

25/6/2020

08/07/2020

3

Sign the contract

25/06/2020

29/06/2020

4

Deploying the manufacturing drawing 

25/06/20 

8/7/2020

5

Steel structure processing

8/7/2020

22/7/2020

6

Main structure and purlins, roof corrugated iron, ordinary corrugated iron

8/7/2020

22/7/2020

7

Delivery of steel structures

23/7/2020

4/8/2020

8

Main structure and purlin

23/07/2020

25/07/2020

9

Corrugated iron roof

3/08/20 20

4/8/2020

10

Accessories (garbage guard)

3/8/2020

4/8/2020

11

Steel structure erection plan

26/07/2020

5/9/2020

12

Plan for erection of main structure and purlin

26/07/2020

9/8/2020

13

Plan to erect roof corrugated iron and gutters

5/8/2020

19/8/2020

14

Plan to install corrugated iron wall

15/8/2020

29/8/2020

15

Plan to erect canopy, roof drainage, trim, frill

30/8/2020

5/9/2020

16

Completion

27/8/2020

5/9/2020

4. Detailed pictures of project construction

dat hoa plastic project

DAT HOA PLASTIC is a project that achieved great expectations from the CBC team and Dat Hoa Co., Ltd. With a period of 6 weeks of non-stop working, the results of the project demonstrate a commendable spirit of cooperation when actively promoting work and completing the project on time. The factory is a great result of the "big man" Dat Hoa's trust in CBC, this project will bring the factory to achieve its ambitions in the plastic industry in the international market

最新博客
https://bmbsteel.com.vn/storage/2026/11/13233/anphabe.jpg
1天前
2026年11月18日,BMB Steel 再次被列入越南最佳工作场所前100名,在由 Anphabe 与 Intage 越南联合举办的颁奖典礼上,于胡志明市的 Thiskyhall Sala 会议中心举行。
https://bmbsteel.com.vn/storage/2026/11/13200/lqd00636.jpg
2周前
从2026年10月28日至31日,BMB钢铁公司胡志明市、岘港、总部及工厂的成员们共同参加了一次前往宁平和河内的旅行,开启了探索北部地区丰富的自然、文化和历史价值之旅。
https://bmbsteel.com.vn/storage/2026/10/13177/dsc07419.jpg
3周前
2026年10月21日,位于Măng Lùng、Tắk Ngo和Kon Pin的三间厨房在Mẫu giáo Trà Linh正式启用,标志着BMB Love School在古越南广南Nam Trà My开展的第二季"抗风中的文字"项目圆满完成。
https://bmbsteel.com.vn/storage/2026/10/13141/dsc07095.jpg
4周前
今年的越南妇女节(10月20日)给BMB Steel的女性成员带来了难忘的时刻,充满了快乐、笑声和地中海的色彩。
https://bmbsteel.com.vn/storage/2026/10/13131/copy-of-sun-3570-1.jpg
1个月前
BMB钢铁继续在发展之路上留下印记,荣获2026年亚太企业奖(APEA)企业卓越奖(Corporate Excellence Award),这是其第四次获得此殊荣,颁奖典礼于2026年10月15日在胡志明市第一郡的珍珠中心举行。
评论 (0)
HOTLINE
(+84) 767676170
CONTACT US
NOW