HCMC Head Office: 148 Phan Xich Long St., Ward 7, Phu Nhuan Dist., HCMC

NEWSROOM

Typical design of a 5,000m2 industrial factory in 2022

07-08-2022

An accurate, detailed, meticulous drawing is the first step to building a successful project. Are you a business owner looking for design drawings for factories? Is the size of your factory in the range of 5,000m2? Today, BMB Steel would like to introduce to you some samples of industrial factory drawings of 5,000m2.

1. What is an industrial factory drawing?

A set of drawings, including specification details, and dimensional and weld information, allows the fabrication of factory components. It may include primary and sub-assembly information, site layout, and component composition in the plant. Workshop drawings contain information taken from both architectural and structural engineering drawings.

The industrial factory drawing
The industrial factory drawing

2. Structure and design drawing of a small factory of 5,000m2

The 5,000m2 industrial workshop drawings sent to customers include two main types: fundamental factory design drawings and construction drawings.

The first drawing sent by the architects to the client is the fundamental design drawing of the factory. Here's an all-inclusive outline of what's going to be in the factory building.

The design drawing of a small factory of 5,000m2
The design drawing of a small factory of 5,000m2

Architects will explain to customers better understand the drawings through such content as an overview of the project (geographical location, construction site, total construction area, etc.), method technology projects to be installed, plans for fire prevention, environmental protection, and applicable construction standards and regulations.

The fundamental factory design drawing includes the following elements:

  • The drawing of the comprehensive plan of the whole project (for the line works, it is the plan drawing of the line plan).
  • Technological line diagram drawing or architectural plan.
  • Drawing of primary structure and related systems.

3. Design construction drawings.

Construction drawings documents include a lot of design documents, but we will list some of the main types as follows:

  • Floor plan of industrial factory.
  • Facade drawing of industrial factory.
  • Cross-sectional drawing of an industrial factory.
  • Detailed drawing of factory architecture.
  • Detail drawing of the factory foundation.
  • Drawing of foundation structure, column structure, and floor structure.
  • Electrical and plumbing drawings of the factory.
The design construction drawing
The design construction drawing

In addition, the dossier also includes many other drawings related to the construction works of the enterprise. The drawings in the construction drawing design will clearly show the details of each piece of a factory, which is the final set of drawings for the contractor to apply to construction. After the investment owners approve the construction drawing design file, the contractor can start building the factory.

4. Notes when designing drawings for industrial factories 5,000m2

The 5,000m2 industrial factory drawing needs to ensure complete data and details of each floor, and each area of ​​the factory, to avoid errors in the construction process.

The data in the drawing must be measured close to reality, and the design of the drawing must comply with the construction regulations of the state.

The designing drawings for industrial factories 5,000m2
The designing drawings for industrial factories 5,000m2

Business owners must choose an experienced and reputable designer to create an accurate drawings and ensure construction safety.

5. What kind of enterprise should choose to build an industrial factory of 5,000m2?

The 5,000m2 industrial factory creates a large space with few columns and a design entirely from a steel frame, making it easy to renovate and expand when needed. The 5,000m2 industrial factory has a flexible use purpose suitable for many types of production. Drawings of this type can be applied to mechanical industrial workshops, industrial workshops for manufacturing components, etc. Drawings of industrial workshops of 5,000m2 are suitable for businesses with small land areas that want to save and optimize construction costs, especially small and medium enterprises.

6. Images from 5,000m2 industrial factory drawings

Below are some pictures of the 5,000m2 factory and industrial factory samples that have been very popular with BMB Steel's customers in the past.

Industrial factory 5,000m2 - RUXCHAI project
Industrial factory 5,000m2 - RUXCHAI project
Industrial factory 5000m2 - Project 9 FACTORY
Industrial factory 5000m2 - Project 9 FACTORY

Drawings are an indispensable component in any construction project, determining the factory's success. We hope the information we give about the 5,000m2 industrial factory drawing will help you have more suitable options for your business's factory. If you have any questions, don't hesitate to get in touch with BMB Steel for consulting support.

LATEST BLOGS
https://bmbsteel.com.vn/storage/2023/09/8584/lien-ket-bu-long.png
7 months ago
Pre-engineered steel buildings are composed of different elements connected through connection systems. This article will explore the bolted connection used in pre-engineered steel buildings.
https://bmbsteel.com.vn/storage/2023/09/8564/cong-trinh-nha-thep-tien-che-an-tuong-do-bmb-steel-xay-dung.png
7 months ago
Consultants play a crucial role in the construction process of pre-engineered steel buildings. This article will explore their importance.
https://bmbsteel.com.vn/storage/2023/09/8549/cong-trinh-nha-thep-tien-che.png
7 months ago
There are numerous types of pre-engineered steel biuldings. This article shall explore some common models of pre-engineered steel buildings.
https://bmbsteel.com.vn/storage/2023/09/8496/ket-cau-nha-thep-tien-che-vung-chac-voi-lien-ket-chac-chan.png
7 months ago
Pre-engineered steel buildings are composed of different elements connected through connection systems. This article will explore the connection systems used in pre-engineered steel buildings.
https://bmbsteel.com.vn/storage/2023/09/8460/cong-trinh-nha-thep-tien-che-an-tuong.jpg
7 months ago
It is crucial to manage costs used in construction of pre-engineered steel buildings. This article shall discuss some factors contributing to construction costs and strategies to optimize the costs.
Comment (0)