HCMC Head Office: 148 Phan Xich Long St., Ward 7, Phu Nhuan Dist., HCMC

NEWSROOM

TOA Chugoku Project

09-02-2020
Table of content

BMB Steel has delivered the factory works contract has handed over their factory for the TOA Chugoku project. The factory opened to put it into operation now.

TOA Chugoku (1)

BMB’s works are fabricated, supply, and erect the factory, which is located in Myanmar. While works were underway to build the factory, the BMB team applied International standards design for more than 20.000 sq meters. “Safety first,” we reached this safety target required a great effort by the team.


TOA Chugoku (2)

TOA Chugoku (3)

BMB Steel

LATEST BLOGS
https://bmbsteel.com.vn/storage/2021/10/4228/thub.gif
The Flora Club House is a small-scale but highly complex project. BMB Steel meticulously calculates every detail of the building for optimal perfection. To learn more, let's explore this attractive pre-engineered steel building with BMB Steel in the article below!

1 month ago




https://bmbsteel.com.vn/storage/2021/09/3956/img-20210817-095613.gif
Proposed Warehouse Complex is a large-scale warehouse and factory project in the Philippines market. Let's learn more about this BMB Steel!

2 months ago