• Project: BATAM SHIPYARD WORKSHOP.
• Area: 15,000 m2
• Owner: Utraco Corporation Batam
• Location: INDONESIA
This is the UTRACo Corporation Shipbuilding factory project at Batam
Total Steel Structure Volume: 600ton
Description:
With the experiences from the ship, building Factory projects Saigon shipyard (3500ton), Sofitel - BRVT (1600tons), HYUNDAI VINASHIN (5500tons), DAMEN shipyard HAIPHONG (2000tons) and Batan project lately. BMB STEEL is proud to be the leading premise in the steel structure engineering erection process for Shipbuilding factory projects.
Assembling steel rafters on the ground before installing
Assembling steel rafters on the ground before installing
Using crane 250T to install steel rafter axis 4/(A-C)
Using 2 cranes 25T to a worker who can install bolts at height
Using crane 250T to install steel rafter axis 3/(A-C)
Installing roof purlins axis (3-4)/(A-C) & steel rafter axis 2 and roof purlins (2-3)/(A-C)
Steel framing system
Steel framing system