Steel structure buildings have become the ideal choice for businesses because of their efficiency, modernity, and cost savings. If you are looking for information or pictures about these projects, find the popular works of BMB Steel below the article.

1. What is a steel structure building?

These are the works using steel structure as the primary bearing part. This type of construction is solid, cost-effective, and has a high bearing capacity.

Construction of steel structure erection works
Construction of steel structure erection works

2. Reasons to choose steel structure building

  • Good bearing capacity.
  • Fast construction time.
  • Easy scaling because of the flexibility of pre-engineered steel buildings.
  • High stability and durability.
  • Simple but very aesthetic.
  • Low construction cost.

3. Top 8 typical steel structure buildings of BMB Steel

3.1. Sailun OTR Factory

Area: 151,000 square meters.

Location: Vietnam.

Group owner: Sailun Vietnam.

Sailun OTR project is located in Phuoc Dong Industrial Park, Go Dau district, Tay Ninh province. BMB Steel undertakes the supply, processing, and erection for the whole project with a total construction area of ​​up to 71,000m2. The steel structure details are meticulously calculated by the BMB Steel team, including thousands of drawings. The total amount of steel to complete the project is 2,559 tons. Besides, it is known that the investor Sailun Vietnam Co., Ltd. has invested more than 800 million USD in expanding the production scale in Vietnam.

Steel structure erection work of Sailun OTR factory project
Steel structure erection work of Sailun OTR factory project

3.2. Marvel Phase 2 Factory

Area: 200,000 square meters.

Location: Cambodia.

Investment owner: Shenzhou International Group (Shenzhou International Group).

With a total investment of 150 million USD after 14 years of operation, Marvel Phase 2 project is one of the typical projects in Cambodia invested by Shenzhou International Group in PPZED Industrial Park, Phnom Penh, Cambodia. BMB Steel is honored to continue being trusted by Shenzhou Group to become this project's design and construction contractor.

It is known that Marvel Phase 2 has become Cambodia's largest textile and garment factory and created 17,000 jobs for nearly 80,000 workers in this country. This will be a garment processing factory for big global brands such as Nike, Uniqlo, etc., to export to USA and European markets.

After ongoing efforts, the BMB Steel team has completed the total factory area of ​​200,000m2 and handed it over on schedule. Besides, during the construction process, we handled the supply, design, and processing for the whole project with a team of qualified engineers and workers.

Completion of steel structure erection of Marvel Phase 2 factory
Completion of steel structure erection of Marvel Phase 2 factory

3.3. MFC WAREHOUSE factory

Area: 40,000 square meters.

Location: Vietnam.

Investment owner: Millennium Furniture.

BMB Steel has built the MFC WAREHOUSE factory that meets FM Global standards. This project is located in VSIP Quang Ngai Industrial - Urban and Service Park, an important location connecting the urban economic areas of Quang Ngai City.

It is known that Millennium Furniture is a group that provides leading furniture products in the US, and the products are distributed in a network of more than 123 countries. In Vietnam, this group has built many factories in Binh Duong and Quang Ngai because this is considered a dynamic market to export products to the US.

With the trust of Millennium Furniture Group, BMB Steel undertakes the design, processing, and erection of two factories, B6 and B7. During construction, BMB applied many international design standards such as AISC, MBMA, ASCE, IBC, etc., with a factory area of ​​up to 40,000m2.

Completion and installation of steel structure erection work for MFC WAREHOUSE factory
Completion and installation of steel structure erection work for MFC WAREHOUSE factory

3.4. Thanh Cong textile factory

Area: 30,000 square meters.

Location: Vietnam.

Investment owner: Thanh Cong Group.

The Thanh Cong textile factory project is deployed in Hoa Phu Industrial Park, Long Ho, Vinh Long. This is a project invested by the investment owner - Thanh Cong Group, with the expectation that this will be a step forward for the domestic textile industry in particular and the international textile market in general.

BMB Steel is very honored to be trusted by Thanh Cong Group to become the project's main contractor with a total construction area of ​​nearly 30,000m2 and almost 450 tons of steel for the whole project. During the construction process, BMB Steel undertakes the entire process from production, processing, transportation, and erection for the whole project. The project was designed by a team of engineers with great care and detail.

The steel structure of Thanh Cong textile factory
The steel structure of Thanh Cong textile factory

3.5. Silver Oak Factory

Area: 60,000 square meters.

Location: Thailand.

Investment owner: Frasers Property (Thailand).

BMB Steel is proud to be the steel contractor for the Silver Oak project. This is a project with a total construction area of ​​60,000m2. The BMB Steel team designed, fabricated, and erected in just 105 days with the spirit of responsibility and effort.

Silver Oak steel structure building
Silver Oak steel structure building

3.6. IMG PHUOC DONG

Area: 300,000m2.

Location: Vietnam.

Investment owner: IMG Phuoc Dong.

IMG Phuoc Dong Industrial Park is one of the typical projects specializing in providing customers with many choices of production facilities such as factories, warehouses, and ports. The factory area, with a total area of ​​​​up to 300.00m2, provides a space of 14 logistics warehouses designed by BMB Steel's team in terms of lighting and ventilation.

Mr. Kobayashi, the representative of BMB Steel, signed a strategic cooperation agreement with IMG Phuoc Dong. With constant efforts, BMB Steel has completed construction and handed over two factories with an area of ​​40,000m2, optimized design, and high aesthetics to meet customers' needs.

IMG Phuoc Dong steel structure erection project completed
IMG Phuoc Dong steel structure erection project completed

3.7. Factory Duong Vinh Hoa

Area: 33,000 square meters.

Location: Vietnam.

Investment owner: Duong Vinh Hoa Company.

Duong Vinh Hoa Company has decided to invest and build a factory with a function that is partly used for lease. The Duong Vinh Hoa project is likened to a bright pearl in Long An.

BMB Steel undertakes the design, construction, and installation stages for the Duong Vinh Hoa project. In particular, this project is a series of blocks designed adjacent to each other and has six factories with the same steel structure. BMB Steel team is trusted to complete the design and construction of a cluster of factories with areas suitable for small and medium needs with a steel roof truss system with an area of ​​3,500m2/workshop - 32mx125m aperture and a large workshop with a scale of 10,000m2 - aperture 63.5mx159m.

Duong Vinh Hoa steel structure project
Duong Vinh Hoa steel structure project

3.8. Warehouse Complex

Area: 17,870m2.

Location: Philippines.

Warehouse Complex is one of BMB Steel's significant projects implemented in the Philippines market. After BMB Steel became a partner with contractor DMCI Homes (one of the major real estate companies in the Philippines), we designed, supplied, and installed the steel part for the entire project.

The warehouse Complex project is located in Santa Rosa, Laguna, Philippines. This is an attractive location that connects to many key economic zones in the Laguna area with a total area of ​​17,870 m2 and uses 432 tons of steel. Upon completion, Warehouse Complex will become a warehouse that brings excellent value and affirms the future PAEC investment owners' reputation. ️

Warehouse Complex steel structure project
Warehouse Complex steel structure project

Above are typical steel structure works of BMB Steel. The BMB Steel team always makes efforts, and we are ready to follow up on every project to bring the best effect for the business. We are always proud to be the leading pre-engineered steel building contractor in Southeast Asia with well-trained and qualified human resources.

LATEST BLOGS
https://bmbsteel.com.vn/storage/2024/01/9141/mong-bang-nha-3-tang-3-bien-tap-bmb-steel.jpg
3 months ago
Among the types of foundations being used today, using 3-story house’s strip footings is considered the best solution to help the building withstand load
https://bmbsteel.com.vn/storage/2024/01/9126/mong-bang-nha-2-tang-10-bien-tap-bmb-steel.jpg
3 months ago
The strip footings are one of the most commonly used types of foundations in the construction of houses, factories, and 2-story houses. The 2-story house's strip footings have a simple structure, easy construction and reasonable cost, suitable for many projects.
https://bmbsteel.com.vn/storage/2023/09/8575/qua-trinh-xay-dung-benh-vien-pathein-myanmar.png
7 months ago
Steel structures have been widely used in constructing healthcare facilities because they offer a number of advantages. The writing below shall explore more thoroughly about this application.
https://bmbsteel.com.vn/storage/2023/09/8524/he-thong-lien-ket-trong-ket-cau-thep.png
7 months ago
Pre-engineered steel buildings are composed of different elements connected through connection systems. This article will discuss the differences between flexible connections and rigid connections.
https://bmbsteel.com.vn/storage/2023/09/8516/ng-dung-cua-ket-cau-thep-trong-cong-trinh-cao-tang.png
7 months ago
There are a number of structural steel systems in high-rise buildings. This article will explore some common structural steel systems commonly employed in high-rise buildings.
Comment (0)
HOTLINE
(+84) 767676170
CONTACT US
NOW