Choosing an effective pre-engineered factory is a solution to help businesses save investment costs. What are the requirements of designing a factory? How to carry out the factory design process?BMB Steelwill answer these questions in the article below.
1. Factory design
The factory design plays an indispensable role in promoting the development of a business’s production. When designing a pre-engineered steel factory, it is crucial to clearly define the characteristics of the business, the premises, and the surrounding natural conditions. In addition, the design must have a sufficient scale to meet the needs of using to bring long-term efficiency to the project.
2. The role of factory design
Factories play a significant role in business and industrial production. The factory design drawing helps visualize the designer's ideas because it has robust measurement data to limit incurred problems during construction. It also assists businesses in understanding the factors needed for a project to invest appropriately.
3. Requirements when designing factories and warehouses
The design of factories and warehouses must meet the following requirements:
The operational function of the building must be clear
The production line should be designed to be convenient for workers to use
Ensure the safety and long-term operation for workers
There must be an investment suitable to the ability of the business.
Technical facilities must ensure standards.
4. The factory design process at BMB Steel
At BMB Steel, the factory design process consists of the following stages:
Fundamental design including explanations and drawings:
The drawings (includes the overview, longitudinal, cross-sectional, and detailed architectural drawings), sub-structures, and primary structures.
The explanation: it is necessary to clarify the designs on the drawings, describe the infrastructure conditions, the architectural design plans, explain the procedures for fire and explosion prevention to ensure the surrounding environment of the building.
The construction drawing design:
The construction drawings must be thoroughly designed based on the specifications of the building drawings
Conducted by expert designers
It is mandatory to have the correct details and components with suitable materials.
5. Notes when designing industrial factories
When designing an industrial factory, there are a few things to keep in mind:
Have full building permits
Ensure the project has a suitable surface area to use
It is vital to propose all specific plans in all cases and conditions to have quick solutions for incurred problems
Construction materials must be invested with high quality.
Calculations must be carried out with exact numbers
Ensuring labor safety during construction
Arranging and zoning areas in the industrial pre-engineered factory to suit the purposes of use
6. Necessary documents for factory design
The factory design document is the technical document (includes the fundamental design documents and presentations). This document should summarize the preliminary conditions of the overall plan, the ground and geographical conditions, show the design plan, technical options, options for the environment and fire protection, drainage, and electricity systems.
7. Process of registration and receipt factory design documents
It is integral to register for the pre-engineered factory design dossier to go through the registration process below.
Presenting ideas of business owners and contractors
The contractors offer a suitable design plan, presents the project file
Present the budget plan, execute the contract
Based on the construction diagram to design the premises
Perspective for the project
Prepare design plans for electricity, water, and fire protection system, etc.
Handle over documents and design drawings
8. Construction cost of Industrial factory design
Depending on the project’s needs, the construction materials, how the contractor builds, the pre-engineered industrial factory designs have different prices. Currently, the price of pre-engineered industrial factories is calculated by m2. Based on the total investment, 2-3% is the design value.
Choosing the right reputable design construction contractor
The project has many choices in terms of design
Standard construction time
Commitment to the proper contract
Construction management and acceptance must be strictly ensured
10. Notes on acceptance of factory design
The design acceptance of the workshop must be the same as what is shown in the drawings.
The factory must be carefully checked before it is put into use to ensure safety.
11. Experience in choosing an industrial factory design company
Find out information through the portfolio
Ensure the business licenses
Read and get reviews and evaluations from other people about the contractor
A reputable unit always has an explicit license, and the contract has adequate terms from A - Z
12. 10 factory designs for your reference
Trên đây là những thông tin các doanh nghiệp cần năm khi thiết kế nhà xưởng để quy trình thực hiện diễn ra suôn sẻ, nhanh chóng và tiết kiệm chi phí nhất. BMB Steel hy vọng với những chia sẻ này giúp doanh nghiệp chọn được mẫu thiết kế nhà xưởng phù hợp nhất!
Industrial factory construction services: Fast, cost-effective solutions from design to completion. Optimize efficiency and quality for your business today.
Prefabricated buildings are an emerging trend in construction, offering affordable, eco-friendly, and quick-to-build solutions. Starting at $2,000, these structures provide flexibility and efficiency for various industries and residential projects.
Explore factory design processes with BMB Steel. Discover 2024 pricing for factory design and construction services, optimized for space, cost, and ensure high-quality construction.
Pre-engineered steel buildings are composed of different elements connected through connection systems. This article will explore the bolted connection used in pre-engineered steel buildings.